- Thread starter
- #1,001
spent today getting my ducks in a row:
- new ignition, door barrels and keys collected
- primary fuel filter, water sep with hand primer pump, 8mm in, 10mm out
- a heap of fuel and vac hoses to plumb everything up.
- joiners for intake and intercooler piping
- reco'd radiator collected.. it was about 40% blocked
- a heap of 3" bends to make a section of exhaust near the rear diff.
- dropped fuel flap and rear door lock barrels to get re keyed to the new ign key
- new ignition, door barrels and keys collected
- primary fuel filter, water sep with hand primer pump, 8mm in, 10mm out

- a heap of fuel and vac hoses to plumb everything up.
- joiners for intake and intercooler piping
- reco'd radiator collected.. it was about 40% blocked
- a heap of 3" bends to make a section of exhaust near the rear diff.
- dropped fuel flap and rear door lock barrels to get re keyed to the new ign key