S4Cruiser
SILVER Star
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
This site may earn a commission from merchant affiliate
links, including eBay, Amazon, Skimlinks, and others.
T-Hoff in Raleigh. There really isn't anyone else that I could find. They did a decent job and quick too. 10 days to inspect, clean, deck head, install valve seals, resurface flywheel and grind flat the intake/exhaust manifold.That is purty!!!
Which machine shop in town did you use?
That's beautiful. Seriously.She's going back together bit by bit as I have time. Was all set to install the head and the damn thing isn't painted. My fault for not unwrapping it after bringing it home from the machinist and assuming.
I'll tape it up, wire wheel, degrease and paint tomorrow if the weather is decent.
The cage looks good, I like how you did your A pillar.
So when are you going to start a tread?
Makes going through your build a lot easyer.