Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
This site may earn a commission from merchant affiliate
links, including eBay, Amazon, Skimlinks, and others.
Holy hell. You must be incredibly drunk at this point@OffRoadScott
I am really taking my time.
Position 4 jack stands - 1 hour
Teardown both sides to spindle - 4 hours
Realized I need a bench vise - 1 day
Teardown both sides completely - 4 - 6 hours
Parts at buddies shop for parts washer - 1 week
Clean repack birfield - 2 hours
Ordered moly grease from NAPA - extra day
Got races in the freezer right now.
Going to buy a brass hammer tomorrow.
Checked the torque on all of my suspension components before going on a quick trip. Rear LCAs were loose.
Oh I am putting together some new kits.
View attachment 1918731View attachment 1918732
Looks like a small rope... I wouldn't trust it.Broke 2 straps last weekend on some dumbass so i went to the offroad expo and bought a 30’ 28,000 pound snatch strap/rope. Made in arizona and warranty as well. Bought a soft shackle as well. Came in a nice carry bag and seems to be VERY well made. They had a heavier duty model but i only had so much money. Hope i never have to use it! Lol
Specs were up to 48% stretch, up to 16mph jump on it. 16 mph sounds like a LOT of speed.....
View attachment 1918592
It's supposed to take 25min, not 20min.Replaced the paper clip power steering cooler (recreational wrenching). Also replaced the fan belts, I noticed they were pretty done... Took longer than twenty minutes.
View attachment 1918857View attachment 1918858View attachment 1918859
I should have just gone snowboarding as usual.