I made a small milestone in my slow moving 68' FJ40 project. The drive train, from the 3F-E motor to the tires, has been installed with all components replaced & upgraded, rebuilt or gone through.
I have much work to do routing brake, clutch, & power steering lines, exhaust, and *gasp* integrating the FJ62 wiring into my FJ40 wiring harness.
After that, I have body work, & painting to do.
"To finish the moment, to find the journey’s end in every step of the road, to live the greatest number of good hours, is wisdom." - Ralph Waldo Emerson
I have much work to do routing brake, clutch, & power steering lines, exhaust, and *gasp* integrating the FJ62 wiring into my FJ40 wiring harness.
After that, I have body work, & painting to do.
"To finish the moment, to find the journey’s end in every step of the road, to live the greatest number of good hours, is wisdom." - Ralph Waldo Emerson
Last edited: