- Thread starter
- #61
Starting assembly. We also need to do another buff and polish on the paint and install the new sunroof glass.
Later in the week the truck is being sent to ASM Auto Upholstery to install the new leather, install a new headliner, new sun visors, re-carpet my drawer system and install leather on the center console.
I also obtained all clear glass which should arrive at the end of the week. Goodbye bronze metallic tint! Finally uniform tint on all the windows!!
After that we will disassemble the interior and sound deaden everything and then install the new OEM carpet.
After that the truck is heading to Slee for ARB lockers, re-gearing, winch install, interior winch controls, OEM dash knob for lockers, etc...
And after that we should have the HID retrofit back from HID Illusionz with a quad projector setup installed in glass Depot headlights setup
Later in the week the truck is being sent to ASM Auto Upholstery to install the new leather, install a new headliner, new sun visors, re-carpet my drawer system and install leather on the center console.
I also obtained all clear glass which should arrive at the end of the week. Goodbye bronze metallic tint! Finally uniform tint on all the windows!!
After that we will disassemble the interior and sound deaden everything and then install the new OEM carpet.
After that the truck is heading to Slee for ARB lockers, re-gearing, winch install, interior winch controls, OEM dash knob for lockers, etc...
And after that we should have the HID retrofit back from HID Illusionz with a quad projector setup installed in glass Depot headlights setup
