How is everyone doing? (13 Viewers)

This site may earn a commission from merchant affiliate
links, including eBay, Amazon, Skimlinks, and others.

1689763905387.gif
 
So many open project here in the Yukon, but very slowly inching forward on the red pig, a few more days until the last of the exhaust bits arrive and maybe, just maybe a first shake down run after two years of nothing. On the upside, I found a cheap 53' sea can that will serve as an interim shop and eventually be one side of a 30x50 shop - then sh*t will get real and I can actually get some project properly on track - including the '75 40 I just found...
20230710_133257.jpg
20230716_194835.jpg
20230716_231256.jpg
 
:) The plan for mine is, convince the territorial Building Safety folks that it's on solid ground (there are no guidelines, they say get the city to approve, city says they don't do that for engineers structures - can't get the two levels of gov to talk to each other). Anyway, once they approve, electrify and start using, next year (maybe) pour a pad beside it, the year after run a 2x6 wall on top of the seacan and slope to opposite side pony wall - or do a cathedral truss. Should give me enough height for a lift and potentially mezzanine space on top of the seacan.... best laid plans anyway.

@scrapdaddy - you could space those and run a flat roof between for two more 55s - see that all the time here and in AK; how you like your wood boiler? we burn 12 - 15 cords a year in ours.
 
@scrapdaddy - you could space those and run a flat roof between for two more 55s - see that all the time here and in AK; how you like your wood boiler? we burn 12 - 15 cords a year in ours
That's where my meat rabbits are going, they will be @ 8 feet apart and then on top of that the solar panels. I love the outside wood furnace. My whole adult life I've heated with wood and this setup is by far the best and easiest. We keep some on hand...

IMG_3817.JPG
 
:) The plan for mine is, convince the territorial Building Safety folks that it's on solid ground (there are no guidelines, they say get the city to approve, city says they don't do that for engineers structures - can't get the two levels of gov to talk to each other). Anyway, once they approve, electrify and start using, next year (maybe) pour a pad beside it, the year after run a 2x6 wall on top of the seacan and slope to opposite side pony wall - or do a cathedral truss. Should give me enough height for a lift and potentially mezzanine space on top of the seacan.... best laid plans anyway.

@scrapdaddy - you could space those and run a flat roof between for two more 55s - see that all the time here and in AK; how you like your wood boiler? we burn 12 - 15 cords a year in ours.
When ya ask ya Father👨‍🦳 and he says goes ask ya Mother👩‍🦳 and you🧑 just go and do it anyway because ya know ya gonna get in trouble🤷‍♂️🤦‍♂️ anyway🤔😥😯😳🤣🤣🤣
 
We all worked wit a Guy!!!! 🤔😉. Who was so full of 💩 he could never wear Sneakers, dats why all us on hand guys wear high work boots (Chippewas😉.) So da 💩 stays out. 🤔😉😘🤣🤣

That works until you have to go into the cess pit under the Fremont hotel to service the lift pumps.

Let’s just say, “Satan’s 🫏hole” and “hip waders required”, and the 12’ overhead dripping on you is 💩and leave it at that.

Mike Rowe used to have a show, “Dirty Jobs”. Someone once asked him what the worst of them was, and it was the pig farm in North Las Vegas.

I used to service the pump there, too. Pigs everywhere. If you stop moving they gather around you. Pig💩everywhere, very slippery. The smell is inescapable.

But the pig farm was way better than the cesspit under the Fremont hotel or the leech-covered lift pumps at the sewage treatment plants.

Lunch break? I don’t think so.


I thank my parents (RIP) for the experience and guidance every day.

Way more 🐂💩in tech.

Way, way more.
 

Users who are viewing this thread

Back
Top Bottom