Saturday 10 March 2018
Alarm goes off 4am I sleep through it eventually I'm on the road 5:40am 190k to go. It rains for the first 100k the michellin's hang on as I sit on the wrong side of 140kph. It's all soon a memory as 1:20minutes later I'm sitting at breakfast.
Then it 7.55am at the workshop for the 8.00am open up Mr Brown lets me know I'm early.
The goal today is to get everything cleanedup and down to the powder coating factory next door. Then whatever else we can do.
Ranjin finishes up the final fit of the service hatches release levers while I find the the engine cover hinges and then work on the cutting out of the hinge holes in the rear panel.
The overhead console has been simplified and the light panel is completed
By lunchtime I have cut out the hinge cut and it all fits nicely in the rear panel.
We spend the afternoon sanding and cleaning the panels 5:20pm they are all in the powder coating factory next door and Mr Brown escorts me there.
Then its onto the clutch we cannot get another one which has the bolts vertical so we cut off the new old clutch mount and prepare a new one. However, the pedal and brake master cylinder assembly must all be removed first.
Mr Brown is guarding the Volvo
The batteries are all fitted just need wiring in and I now have a straps box.
Then it's hometime after cleaning the workshop and leave IPOH headed for KL. I hit the start of the highway at 130kph and floor it all the way back to KL for a nice quiet beer and a meal.
Tomorrow is the Orphanage Kids Kayak training
Close yes it's really close to being finished.