- Thread starter
- #101
Grouted L-bolts into the cells of the top of the block to bolt down the sill plates.
Yep, going to wait until it is under roof to pour the floor. In this case I can build the walls on the floor of the existing workshop.
Yep, going to wait until it is under roof to pour the floor. In this case I can build the walls on the floor of the existing workshop.