Got some more parts sat., radiator, fan, belt and a few others. Pulled the thread cert out of the thermostat and tapped new threads for metric cert....it worked. Welded in some washers and nuts in bottom of the radiator support. Started putting the alt. belt on and noticed the pulley is to narrow. Some thing else to sort out. Went to finishing up the gage panel and hooking stuff up.
Not very pretty but it will do. Hopefully the manifold will be done getting spot surfaced by tue. and I'll get to hear her run some time this week. Think I need later model adj. bar, still got to get fuel line clips and the tube that runs down the side of the block. New bolts for the alt. bracket along with the clips to hold the brake and fuel lines to the frame will be here by Fri. ?
Last edited: