Guys? hhmmmpppfff
And I wouldn't call it "dropping it in" more along the lines of "wedging it in."
Thanks to EVERYONE who came by! We got a ton done.
I thought my 2F was ready to drop in but when Trollhole showed up he pointed out about 3 dozen things wrong! (oops)
We dropped in the 2F, tranny and tcase. Put on a different fuel pump. Replaced all heater hoses in the engine bay. Took out some power steering stuff I didn't needed since I went over to a Sag pump. Installed new fog lights. Ate lunch and drank some beer.
After everyone left I kept working until about 1130 pm and then worked most of the day Sunday.
I did make one BIG oops - I dropped a nut into the intake manifold but LUCKILY I was able to fish it out with a magnet.
After all left and through Sunday I installed the radiator, grill, front valence, front bumper, winch, driveshafts, new 90wt in the tcase and tranny with new crush washers, cleaned up some wiring, installed the carb but I need to finish hooking it up.
What I have left to do:
1) install different rocker studs (need to source)
2) hook up carb
3) hook up starter
4) turn battery around
5) install oil pressure sending unit (need to buy)
6) install choke cable (need to source)
I'm hoping to have this stuff done so I can break in the new cam and motor this weekend!