Chungas Revenge
SILVER Star
Phase 3: Running lines. This is probably the most challenging and my favorite part. I cut a hole in the floor to run the dual lines through, using a spare grommet I had for the firewall heater lines. I put a piece of rubber hose over the hard lines where they pass through to seal it up. I bent up the lines from tank to where they’ll meet the soft lines to frame. Flared for tube nuts/sleeves and cleaned up with scotch brite for a matte finish. These lines actually make a turn toward the frame under the body so they were a pain to get right and to snake in.
Next I ran the lines in the engine bay. Started at the sniper end with the return line: I knew I’d want it on the bottom of the stacked lines. Then, feed line, adding in a fuel pressure test port.
Last, I ran the frame lines since I now knew where I wanted both ends to land. Mounted the filter with quick connects and the soft line directly to one end for easy future filter changes. Snaked them up and over the body mount and frame, keeping clear of transfer case linkages. I used 2 rubber lined line clamps to hold them in place. Connect both ends with the vapor guard soft lines and I’ve got a fuel system!
Clean, very clean...!!! Plans for a booster later? I’m sorting this out now myself. Always looking for a good idea(s) to nick and claim as my own.
