Well, it is finally going to happen, a pole barn (cruiser workshop). It only took 30 years of wrenching in the driveway, many times only after shoveling a spot to work from. 30 years of dropping the wrenches, sockets, etc because my fingers were too cold to hold them any longer. Finally I get to move all the cruisers and parts home from my shop at work to my new workshop. Just signed on with the excavator to prep the building pad and then in October the building goes up. Current dealing with the village for permit, conditional use, etc......I will be documenting the entire process with pics and comments on the build.
Northland Buildings
30 x 48 x 16
16 x 14 OH door
3 x 7 man door
2-post lift (eventually)
Northland Buildings
30 x 48 x 16
16 x 14 OH door
3 x 7 man door
2-post lift (eventually)