I picked it from a guy in East Texas off of Craigslist
During COVID I had a metal building (40x60x15’) built for a machine shop on our back property. It’s a hobby shop. I will run some parts from my day job to keep the utilities on.
Gang, let me know if we need to make anything for the LC 100? Once up and running could be fun.
Most proud of the polished concrete floor that took us a full week of polishing and staining. Machines are in (but not installed yet) and we are finishing up the electric (480V 3-phase).
View attachment 2912732
View attachment 2912733
View attachment 2912734