I’m realizing, that I have no clue what I’m doing. I’m so glad that I have someone local here to point me in the right direction keep this project going. Thanks.
@cjmoon Of course, I should also blame you for putting this in my head I could do something like this. With that said, got the rear suspension roughed in place last night. Only problem is I could not find any of my plumb bob’s, so used chalk lines for now. Here is the upper wishbone link. I used the OEM links on the frame side, then found that 1" OD would go inside those tubes, so bent up some scraps for testing phase. Since they are sleeved, we can move it in and out to get the right pinion angle during this phase.
For the LCA, my plan is to again use the stock mount on the frame side, then sleeve in DOM tube just like we make the heavy duty LCA's for stock rigs. For now it is cheap pipe again sleeved, so we can move it back and forth.
Here you can see I had to plasma off some of the upper bracket for everything to fit.
Will pick up some plumb bob's today or tomorrow and
@cjmoon is coming over Saturday to help cycle and make any changes. With any luck I can start burning this in!