I pick up my Cruiser next weekend and can’t wait to see how these turn out. If they line up well enough for the rear seats to serve as a sleeping platform, that’s the perfect design and I’m in.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
This site may earn a commission from merchant affiliate
links, including eBay, Amazon, Skimlinks, and others.
To anyone ready to purchase, really really serious, please vote for the 200 to be next, here:
Vote For The Next Drawers
I will email those folks (and post here) but it helps me gauge seriousness for the 200 vs the others, and with limited time sooo valuable I appreciate it.
LOL, will do, PM or email me your address and I'll make sure you're in there. It takes a lot of time to keep track of who says what on MUD in which thread, so that's why I'm using the survey as my list.Dave:
Only seems to be partially working, got my email address in, hit the 200 series button, and then it froze. Must be a hanging chad, but add one more 200 series owner to the tally!
Louis
Hey guys, sorry I've been quiet but it's only because I've been at my limits with orders + Sharknet & Remora getting up and into production. Those are both about to calm down in a week or two, and then I will pick back up the 200 series. I have 2 test rigs so hopefully things go quick. Any other test rigs in Bend though, holler, can't have too many.
After I have a good proto I will fire up the pre-order page online, with shipping 4-6 weeks.
Hey guys, sorry I've been quiet but it's only because I've been at my limits with orders + Sharknet & Remora getting up and into production. Those are both about to calm down in a week or two, and then I will pick back up the 200 series. I have 2 test rigs so hopefully things go quick. Any other test rigs in Bend though, holler, can't have too many.
After I have a good proto I will fire up the pre-order page online, with shipping 4-6 weeks.
I have 2016 in Portland, happy to make it to bend for 16+ testing.Hey guys, sorry I've been quiet but it's only because I've been at my limits with orders + Sharknet & Remora getting up and into production. Those are both about to calm down in a week or two, and then I will pick back up the 200 series. I have 2 test rigs so hopefully things go quick. Any other test rigs in Bend though, holler, can't have too many.
After I have a good proto I will fire up the pre-order page online, with shipping 4-6 weeks.
Ask me Friday.......................@cruzerDave any update to the KISS drawers development? I want to get these in my truck before LCDC in July.
Ask me Friday.......................