ATC "Thread Shed" Mountain Shop (1 Viewer)

This site may earn a commission from merchant affiliate
links, including eBay, Amazon, Skimlinks, and others.

Very well thought out build. What a view. Floridians vacation in the mountains. Congrats. If ya need a place in Fl. Near Destin hit me up.
Mike
 
We've been hit with several below zero days and plenty of snow but have managed to get some beams installed for the loft. Slow going when the doors are open and it's - 5........Can't wait till spring and summer to get it done!

90773B6A-232D-4C16-86FF-3C40A178EEDA.webp


AD03F153-3024-4200-A258-88E5928EEEC6.webp


0BFCFD13-71F1-4D08-B2C0-E51AEE1AE697.webp


7760B913-1637-4D71-8953-FBD544B58F5D.webp


77E78ED5-03FA-4725-A5B2-EEEAFD1C3527.webp
 
So, most people that own a barn/shop try to keep dust, bugs or mice out of the shop.......hell no, not me!
I have to worry about friggin Bullwinkle stopping by for a bourbon!!!

09F39699-ED21-4A93-8E27-4F5BA39ED1F1.webp


EF626EC9-F559-4BE5-AAEA-AE7E6C18D9C5.webp


9376C418-85BF-4ACC-8386-2FBFB5D07378.webp
 
With the recent nice weather we've managed to get the left and right bays/lofts up and the posts cross drilled and bolted. Should get the center mezzanine beam and joists in tomorrow!

67C7FA7C-2EA2-42E3-BF6D-B0B5577D6715.webp
36E6FF15-467B-4454-8F92-78E59C0B47ED.webp
A368E13B-C5AD-49D0-9DB7-88AF1C3FE405.webp
0E95F836-F898-487E-8673-51A54D58CAE6.webp
53F08267-0399-4C40-B60B-58996DD83DB8.webp
 
Nice work! Question on your post plates, are they bolted to the floor somehow?
Yes. The plates are 1/4 inch steel with a center hole in the base plate for a 5/8 inch anchor bolt drilled into the concrete and the bottom of the post is drilled out to sit over the top of the bolt. Also, the entire concrete floor is 5 inchs and I had six additional 7 inch footings (6-8 feet in diameter) poured for each post for a total of 12 inches of concrete and rebar under each post. The other two 12 inch footings are for the future vehicle lift.

CF686A9B-B121-494C-8CEB-CF82BA5E7D40.webp
854B630A-FF72-41B1-8D28-D6C2C3D60705.webp
0E7E4EB2-3589-49D4-8271-A9F2354FF8DA.webp
4454AD2C-4D76-43CC-93CE-364EA09BEEC3.webp
111FB79D-39A2-4A16-9A72-6CD5E0ECB274.webp
 
The posts are 8x8 Douglas Fir reclaimed timbers. Each one is notched at the top supporting the loft beams. I'm having some additional custom 1/4 plates made to bolt the beams to the posts. Trying to keep some of the miner history alive with these great old posts!
C2D55653-9D7A-420F-B750-4943E332F522.webp
47C0B483-56B6-4676-9C8C-B1F49F29FEB2.webp
09107674-CB60-4CD9-91BB-6CC38FB64D4E.webp
6E6D0988-FE2E-4470-B843-D642AA3F9A54.webp
 
Always annoying when your cheap labor leaves early.......
7BA048BA-C856-401B-AD31-4FD2F2D437CA.webp
 
Got the mezzanine in and now order the rough cut planks for loft floor.
972733C1-58D6-4B47-BA81-75603B64F30E.webp
19E02AA0-C410-4935-8C20-7E3C0FC6196F.webp
 
Had a little spare time today and decided to spend a little time in what has become on of my favorite forums here on MUD and just came across this project. Wow, what a great looking location and amazing shop build. Love how to you are keeping the history of the location alive with the design of the shop. Any updates since the last past last year?
 
Had a little spare time today and decided to spend a little time in what has become on of my favorite forums here on MUD and just came across this project. Wow, what a great looking location and amazing shop build. Love how to you are keeping the history of the location alive with the design of the shop. Any updates since the last past last year?

Many thanks! I forgot to update this thread due to simply being busy with both the shop and life. We did get the 2 x 6 rough cut beetle kill pine flooring in, steps built, utilities down to the shop and start filling it.
100208CB-EF10-49FE-A3EA-F938ED3FE3FD.jpeg
2C0B53F8-4CCC-4F0E-AC3E-2BEFC384C528.jpeg
49A3FFEC-DAB3-466D-8B3D-B231E58C73C9.jpeg
 
E9E5247A-385B-4E5E-A2A4-49C727B267CA.jpeg

77CD510B-DEF9-499B-B9E9-ACDBAC4B06B0.jpeg

05FF9F9A-E9EE-4260-92B9-3F3ABDE617A8.jpeg

1F5DB675-EBB0-4ABE-BEBF-1E41E51A8A4C.jpeg

A1C6A801-9D9B-4F4D-B380-3A3932C8BF28.jpeg
 
Once we got the loft and stocked we added a 10k Bendpak Vehicle lift and hope to get it wired this summer.
A874ECC5-A947-4EE8-95D5-85E1B1EDCBC3.jpeg
33997C1E-F273-431D-B252-AE4F063B7B76.jpeg
D391AE67-F3A8-41FC-8CB3-0D42A145BC62.jpeg
2BE4AF0C-7140-45B2-982B-11D5F43E8E8B.jpeg
3F2C4FB2-8DD9-402A-ABE5-B1D4D4B68B0A.jpeg
 

Users who are viewing this thread

Back
Top Bottom