Thinking about it right now
I was going to finish a complete mock up before tearing down and rebuilding engine, tranny, t-case, diffs, suspension, frame including paint/ powder - with the idea of a finished chassis before turning to the body.
But I suppose there is no harm in having the H55f/toybox/splitcase/twinstick/drum p-brake fully assembled and refurbished before teardown. I would just have to keep it clean and covered while finishing my roll cage and mounting seats etc.
I have a few things to do first before pulling the drive train back out for rebuild.
mount hydro-boost and master cylinder
power steering/ hydro-boost lines
charged air line from intercooler to intake man.
check rad for fittment
mount waste gate actuator and plumbing
throttle linkage
Then I can pull the train out and....
re-install the flywheel
test compression and act accordingly
re-build 5 spd
install the toybox
rebuild the splitcase with drum brake and twinstick
Then put the train back in and solve the cab floor clearance for the toybox as well as the tube cross-member clearance. I want to section the floor and tranny cover and extend them roughly 7". I will of course do that in the most original looking way I can. I think I'll remove the well for the gas tank to make the floor flat (with ribs). Then I will cut a square section in the middle of the floor and slide that section back 7". Fill in the gaps, cut and extend the cover to fit.
There is a hat channel shaped rib under the cab that I will re-fab to run 7" further back and still look original.
When I put a tape measure on the output flange of the splitcase I have 7.25" to the tube cross-member. I am adding 7" to the length of the drive train.........so I think it will fit but I am going to see for sure when I get it in there and see how it sits and think about flex etc.
But before all that I have a bunch of sills and snorkels to build in order to pay for the stuff I bought. I am off work next week and although I will be Daddy Dacare I hope to get some stuff done on my rig. I can't logistically make sills and watch the kids at the same time but I can watch them and work at home.
sorry to ramble... but it's my thread
