kunzma
SILVER Star
- Thread starter
- #281
Buttoning up some things that had been left partially complete. One was the pyramidal tread running board material. I had cut it to size and installed it with only the trim ring and some new stainless bolts. The mat seems to have expanded and puffed up in the middle over time. Decided that some contact cement was the ticket. Applied a coating to both. Allowed that to tack up. Laid some wire down on the running board to keep the mating surfaces from touching. Put some screw drivers and allen wrenches in the bolt holes to line everything up. Starting from the middle I pulled the wires out while working out to the ends. Clamped it overnight. Been a week now and seems to be holding.
Last edited: