My FJ45 EC is going to FC Fabrications for tube fenders and shocks on the 11th so I have to get a few things done on it.
I stopped by tuesday and checked on the progress. After meeting and discussing a few things with Don a few changes were made.
He spent some time with the Plasma Cutter and removed all of my "booty-fabbed / Looks like a trail repair weld" kinda stuff. I told him it was just for mock up. He laughed so hard, I thought he was going to piss himself.
The New traction bar and traction bar mounts were installed at both ends of the bar. I saw the traction bar just as it came out of the paint booth. WOW looks nice.
The frame is shortened in the rear. New crossmembers were installed at the very rear. More will be added as the rear shock mounts are completed and the fuel tanks are reinstalled.
The Kay-Mar swing out fuel can holder was modified and now sports an FC Fabrication triple fuel can mount. Check his website to see a few pictures of his designs.
www.fcfabrication.com
The front hoop is installed on both side for the shock mounts. He is starting on the front tube fenders. He is incorporating the fiberglass hood onto the tube fenders.
Battery is getting relocated.
The fuel tank are out and he is starting on the mounts to reinstall them. I had them mounted too low for the traction bar setup. They wil be moved up a few inches.
It looks very good. I will let him post pictures.