DanS HJ-45
SILVER Star
Pretty well.
https://forum.ih8mud.com/diesel-tec...-fj-40-getting-3b-turbo-h55f.html#post3811936
I got waylaid on my way home, so I didn't get any prep work done, so mostly we just got all the junk out of the tub and the front sheetmetal off, the compression check done, and a bunch of miscellaneous stuff disconnected.
Today I got it all ready to pull the tub, but found a lot of rust in the rear sill, enough that one of the bolts is going to require a dose of either the plasma cutter or the sawzall. Either way, tomorrow morning: it's a dead bolt.
I'll post pics and stuff of today's progress in an hour or so (after dinner).
Jon: a PO did put in an electric fuel pump. They also cut the metal gas line, and ran a single rubber line (with the plastic filter and pump in line on the frame rail). It was a pretty ugly job IMHO. I think I saw some speaker wire going to the pump, and I for certain wouldn't trust the wire splices they put in there next to a gas line.
I'll put the metal line back in, and put in Viton flexible lines for biodiesel compatibility.
Dan
https://forum.ih8mud.com/diesel-tec...-fj-40-getting-3b-turbo-h55f.html#post3811936
I got waylaid on my way home, so I didn't get any prep work done, so mostly we just got all the junk out of the tub and the front sheetmetal off, the compression check done, and a bunch of miscellaneous stuff disconnected.
Today I got it all ready to pull the tub, but found a lot of rust in the rear sill, enough that one of the bolts is going to require a dose of either the plasma cutter or the sawzall. Either way, tomorrow morning: it's a dead bolt.
I'll post pics and stuff of today's progress in an hour or so (after dinner).
Jon: a PO did put in an electric fuel pump. They also cut the metal gas line, and ran a single rubber line (with the plastic filter and pump in line on the frame rail). It was a pretty ugly job IMHO. I think I saw some speaker wire going to the pump, and I for certain wouldn't trust the wire splices they put in there next to a gas line.
I'll put the metal line back in, and put in Viton flexible lines for biodiesel compatibility.
Dan