Toyota Part numbers
Assume 1, other quantity specified
The filler 77201-60B00, or 77201-60B10 or 77201-60B90. I used 77201-60B10.
The sub tank Tank Sub-Assy, Fuel 77001-60831
Fuel Pump Assembly 77020-60372
Tube Sub-Assy Fuel 77017-60550
Tube Sub-assy, Fuel 77108-60160
Tube Sub-Assy, Fuel 77108-60170
Gasket, Fuel Suction Tube Set 77169-47030
Tube Sub-Assy, Fuel 77206-60461
Hose, Fuel Tank to 77213-60320
Clip, Tube Joint 77241-33011 (3)
Tube, Fuel Main, No. 3 77253-60331
Hose, Fuel 77259-60880
Shield, Fuel Tank 77291-60120
Gasket, Fuel Tank Cap 77316-52040
Ring, Fuel Inlet Box 77371-35010
Ring, Fuel Inlet Box 77391-35020
Hose, Fuel, No.3 77419-60020
Band Sub-Assy, Fuel Tank, No.2 RH 77603-60040
Band Sub Assy, Fuel Tank, No.2 LH 77604-60040
Bolt, W/ Washer 90119-10816 (2)
Wire, Floor, No. 3 82163-60410
Gage Assy, Fuel 83320-69535
Screw, W/Washer 90159-50129 (6)
Clamp Hose 90460-46005 (2)
Clamp 90460-22001 (3)
Clip, 90959-04001
Hose, Breather 95313-13020
Clip, Hose 96135-51300
Clip, Hose 96137-41501
Ordered, but didn't use
Retainer, Fuel Pump 77144-47020
Tube, Fuel Emission 77263-60120
Tube, Fuel Emission 77263-60110
Bolt (For Automatic Transmission) 91651-B0820 (4)
Gasket 77169-32010 (siphon, one came with it)
Screw w Washer 93319-A4010 (6) sender gauge came with screws
Total Cost:
Partsouq orders with freight (tank, pump, all the rest of stuff) - $1240. (Note if you rebuild your fuel pump should be $300 less)
Filler from Australia - $180.
Tools, hose, clamps, brass barbs - $150 (estimated, it was less than I thought it would be). Note that if you reuse the manifold hardline this is $40 less)
$1200 to $1570 (includes tax, freight, incidentals)
Time - Car down for four weeks, I estimate 40 - 50 hours total. Doing it again I think it's a full weekend project (15 hours?). I assume it'll go a lot faster now that the recipe is in place. I spent literal days working on stuff that now can be done in a couple hours (example spent six hours trying to fit new filler, when with body lift took 15 min. Running hose to engine bay vs using hardline - 4 hours probably saved. Trying to find a place for the charcoal canister - 4 hours saved. Just cutting off the vent fitting instead of trying to remove it and inventing a tool to do so - 6 hours, Knowing it will work so don't have to make everything reversible, 6 hours.)