Things are happening. I’m going to start working on it Sunday.
I’ve got a new oem fuel tank, an oil filter conversion adapter for a metal filter, a tune up kit, full radiator hoses and clamps, an oem nos fuel pump, valve cover gasket and other small things on the way.
Not ideal, but I snagged a set of 60 series wheels for it. I want 40 series Steelies for it, but that can wait for now. I’d like a 235/75-15 or a 30x9.5 in a MT. The Chunkier, the better.
Time to see if I can get the old F motor to work.