After a week at the shop I picked her up this morning and am super happy with all the new work ....pretty much sorted all the final PM and mods short of need to swap out the reartsprings for a bit lighter version until I get the sliders on and rear bumper.
a HUGE improvement in ride quality and can really enjoy the Icon's now that the front is down to 21 3/4" ......and a fresh alignemnt really helps !
They added drilled/ slotted Stoptech rotors with EBC pads and new lines and fluid really haul her down..... need to get them bedded in tonight once I get the spare parts out of the truck - but it's impressive...... they also replaced both front halfshafts with OME ( ouch) and changed all fluids and repacked the bearing and replaced seals......
For the engine I had them replace the Fuel Filter, Fuel pump ( upgraded fro URD), plugs, all new coilpacks, blueprinted injectors and hoses and belts and a ton of vac lines.... it totally seems to have cured the starting issue and the power deleivery is much more linear...
More importantly - they did the DT headers..... and at the same time did the starter and motor mounts...... a solid day they said, given the SC'er and the lack of space.... strangely the headers seem to have knocked some of the drone out but that's just an initial impression... will update.
Really looking forward to working to finalize a few details ( LED bar for the Gobi & an Spod ) and get some time on the trail over the long weekend......
Expensive as heck , but I lack the time right now to do it - but awefully nice ot have it all done....