For those offering to help on Mrs. Jones:
Date: Sunday, January 3rd
Time: 10:00
Address: 920 Elliot Farm Rd.
Fayetteville, NC
This is outside. Supposed to be sunny but a little chilly.
Current State of Mrs. Jones: She has been stripped. Her tub is on a frame next to her. The 2F is still in place.
Goals: Mate 40 series H55F to 2F. Check clearances for transfercase parking brake and supports. Set tub to check clearances at transmission access panel and determine if what if any modifications are actually necessary. Remove tub. Remove transmission. Remove 2F and set on shipping frame.
Tools on hand: I have 1 Milwaukee cordless impact gun and both deep and shallow metric sockets. Hoist, straps, floor jack, and motorcycle/transmission lift (pretty useless as tight as everything is)
If there is something else needed let me know. I'll do my best to acquire it by the 3rd.
Bribe: Food, drink, beer, warm fire and my sincere appreciation.
Please let me know if you can make it. I know it's not a big job or technically challenging. Pretty much grunt work.
Thanks, Tom