i had to go to nyc today and didnt get a whole lot done yet, here's a few pics, the rear diff is also welded now, just gotta bolt it back in
- spring hanger tacked in place
- fj60 ubolts/plates
- ifs rear axle, cleaned up and painted
- shackle hangers, relocated, and boxed the ends in for more strength
- all bolted up with new bushings and hardware
- shackle angle is decent, it'll be about perfect once there's another 500lbs or so worth of propane tanks, tubing, spare tire, tool box, etc...
- spring hanger tacked in place
- fj60 ubolts/plates
- ifs rear axle, cleaned up and painted
- shackle hangers, relocated, and boxed the ends in for more strength
- all bolted up with new bushings and hardware
- shackle angle is decent, it'll be about perfect once there's another 500lbs or so worth of propane tanks, tubing, spare tire, tool box, etc...
