cruiserwanted said:
I've got a buddy that I am/was helping with a 75 Bronco, the goal on that was memorial day. But, he's lazy and quit working on it, even though he just got a new fiberglass body for it 3 weeks ago.
I won't go so far as to commit to a date, if I miss the completion date the dreamstompers will be all over me telling me how the world is flat.
I spent a good month and a half sourcing parts and getting my chit together before I even touched a bolt on the lv. Now that I have the majority of my parts, I probably will bust ass and try to hammer it out as fast as I can. I have been building my own house for several years now, and I have to keep the wife happy by working on that once and a while. Should be able to sneak the LV in there quite often though.
I had an extra hour before work this morning and I pulled the driveshafts in the 79 donor vehicle. I want to have the front and rear axles pulled out of the 79 by Tuesday and try to get them de-greased by Wed. If all goes as planned this weekend with motor mounts and saginaw plates welded in and then disassemble everything off the frame: I plan to drag everything down to Fargo, ND on Saturday, April 9th and have it all sandblasted. Spoke yesterday with a buddy of mine who does comercial powdercoating locally for Polaris ind. He is going to order up black in 100% gloss today, frame and some other misc. parts are scheduled to be powdercoated Monday, April 11th, 2 days after they will be sandblasted. I am going to paint the axles after blasting with PPG DP90LF and topcoat with PPG's/MTK single stage urethane in black. I just don't want to pull the axles apart if I don't need to.
What is going to slow me up is Parabolic springs. I ordered them in Febuary and supposedly they are just now somewhere over the Atlantic? I have a strong suspicion that I won't see those for another 3 to 4 weeks, we'll see I guess? If I had the springs in the next week, I think I honestly could have the frame, axles, entire driveline and other misc. chub bolted in and ready for a tub in 3 weeks. Without springs, I'm dead in the water.
If I'm waiting for springs I will start on the tub. Should be bolted onto the rottisseri this weekend and ready to be spun anytime.
Pics will be coming shortly.
Matt