Got a enough done the last two days that Monday should be easy.
There used to be crappy storage rooms/sheds there. Tore all that down and the 3 of the four layers of flooring up
The other two rooms will eventually come down but on of the walls in there is connected to the house so I may fly down and help him do that next month.
Filled up and hauled 6 of these already.
It has been the worst demo job I've ever been a part of. Whomever built that thing went to the school of there must be a nail or screw every half inch in every direction in every piece of wood.
View attachment 1467291
View attachment 1467292
View attachment 1467293