Damn.... Sweet work Tuckers!!
Can't wait for the party.
Thanks Buddy. Hopefully we will be ready for guests in a month or so. Things are starting to move along and I think we may be wrapping things up about mid May.
They got the carpet in upstairs last week, basically just need tile and cabinets in the bathroom and the upstairs will be done.
The septic guy finally got his part finished up and is just waiting on inspections to cover things up. I had him take my rock pile and use it to base the final alignment of the driveway. Just need to have some stone delivered to slick it up a little, but pretty pleased with it.
He put a little of the dirt around front, emphasis on "little". I am going to have to rent a skid steer to get all the final grading sorted probably, but that's ok, at least it will be just the way I want it.
And here is one I took a few nights ago with all the lights on on the garage end of the house.
The hardwood has been sitting for about a week and per the installer it has acclimated well and if they had opened all the boxes They would have started install yesterday, so I am pretty sure we will have flooring by mid-week. The tile for the bathrooms should be here this week, so hoping flooring will be close by weeks end, cabinet bases next week sometime so we can measure for tops, then we should be rounding the final turn and getting into the home stretch.
I spent today doing some grading and mowing everything that wasn't dug up in the back yard. Got a helluva farmers tan today, more of a burn really, but after feeling useless for the last month or so, it was good to get something done.
More to come, sooner than later hopefully.
