The words "so close you can taste it" are being chewed on around these days. Unfortunately at this point we are at least 2 weeks out. Not gonna bore you with another rant about subs and suppliers, but let's just say the cabinet guy and granite folks can suck a fat one as far as I'm concerned. Cabinet guy screwed us, and the granite folks are taking their sweet time.
Install date is June 3rd, so this coming Friday and since the plumbers don't work weekends, the plumbing and electrical won't start wrapping up til the following week. Throw in inspections and misc crap th a will inevitably happen and we are looking at the 10th at the best, but given how this has played out, we will be lucky if we get in the following week.
Anyway, the cabinet guy did show up and get the rest of the shells in. So now we need tops, doors and drawers. We have appliances too, but the Elec/plumbers just want to make one more trip, so for now we are in that all to familiar "hurry up and wait" pattern. Its gonna get there, I just really feel like this poor guy these days.
Anyway, here are a few pictures of the completed cases.
Laundry/mud room
Living room
Kitchen
And in case you didn't notice, I will point out that we had the section between the fridge and the oven built 2" shorter than standard for Erin to use as a work station. Something about leverage and being short...
Anyway, she spent the last 2 days sweeping and swifering floors and we hauled out and burned anything that isn't supposed to live there unless it had something heavy sitting on it. We plugged the fridge in on Friday so we can keep some drinks and snacks out there. We are soo ready...
Hope to see some coutertops on friday, but other than that not looking for anything else major this week, unless the cabinet guy gets a wild hair and actually gets something done. We shall see.
Install date is June 3rd, so this coming Friday and since the plumbers don't work weekends, the plumbing and electrical won't start wrapping up til the following week. Throw in inspections and misc crap th a will inevitably happen and we are looking at the 10th at the best, but given how this has played out, we will be lucky if we get in the following week.
Anyway, the cabinet guy did show up and get the rest of the shells in. So now we need tops, doors and drawers. We have appliances too, but the Elec/plumbers just want to make one more trip, so for now we are in that all to familiar "hurry up and wait" pattern. Its gonna get there, I just really feel like this poor guy these days.

Anyway, here are a few pictures of the completed cases.
Laundry/mud room
Living room
Kitchen
And in case you didn't notice, I will point out that we had the section between the fridge and the oven built 2" shorter than standard for Erin to use as a work station. Something about leverage and being short...
Anyway, she spent the last 2 days sweeping and swifering floors and we hauled out and burned anything that isn't supposed to live there unless it had something heavy sitting on it. We plugged the fridge in on Friday so we can keep some drinks and snacks out there. We are soo ready...
Hope to see some coutertops on friday, but other than that not looking for anything else major this week, unless the cabinet guy gets a wild hair and actually gets something done. We shall see.