Just done with a 4" Downey Lift with Marks Off Road Shackles and 33x12.5x15 BFG Muds. Done lots of searching on this subject and I'm leaning towards 5100's in the back and 5150's up front. My concerns and questions are:
1. 5150 too stiff?
2. Major difference between 5100 vs 5125?
The rig will be seeing the road for now but is being built to see the trails eventually. Thanks!
1. 5150 too stiff?
2. Major difference between 5100 vs 5125?
The rig will be seeing the road for now but is being built to see the trails eventually. Thanks!