StaticTorque
SILVER Star
- Thread starter
- #41
I’d say average guy (myself) no, not at all. To do it right and make sure all the seals are aligned properly, I don’t think so. I did about one door a day. Usually 2-4hrs. And I’d get too stressed or tired, so I’d call it a day so I don’t mess it up.Do you think an average person could knock it all out in a day (cargo ones aside). I have also got to do the mudflap ones as well