Juice's HAMOM - March 14

This site may earn a commission from merchant affiliate
links, including eBay, Amazon, Skimlinks, and others.

I'm going to try to be there. I'll let you know when it gets closer to time, but for now, count me in.
 
Heading to see how much a soft top will cost and when it will be done...timeline will decide what truck I drive.
 
I should have it in for work on the 23rd or so. Hoping they can make the whole top that week so it will be ready in time. If I get inspired I could have the stereo in and the bedliner done too.
 
Looks like $1500 all in for the most complex design. Will be taking it in on Friday for measurements. Work will start on the 23rd!
 
I have the tranny primed and the frame primed back to the front of the rear springs. I'll paint both in a few days. The rear bumper w/ dual swing-outs is about 90% tacked into place. All I have left on the bumper is to put the catches on so the arms won't swing closed when you are on a hill.

2F is about ready to drop in. I put on the bell housing and fly wheel last night. I'm going to take a stab at the clutch tonight. I'm trying to be careful and not do anything that will have to be redone at the HAMOM.

I took some pics this morning to post but I left the download cable at home. :doh:
 
I am going to try and make this, my wife has to work so it all depends if I can get a sitter.

-Boot
 
Steve, if you want to bring the pump and pully to Durhamtown, I can bring the P/S pully press
 
I am going to try and make this, my wife has to work so it all depends if I can get a sitter.

-Boot

Hope to see you there Lenny.

My 2F is almost ready to drop in my Pig. I got the clutch installed last night along with the tranny and t-case. I'm waiting now to get my coated exhaust manifold back - I hoped today but maybe tomorrow.

DSC02504.jpg
 

Users who are viewing this thread

Back
Top Bottom