Welding in frame repairs

This site may earn a commission from merchant affiliate
links, including eBay, Amazon, Skimlinks, and others.

i might try a cardboard template and box it in with all new metal. and I have some 1/4" plate to use up...then rust removal on the surface and look for more holes filled with bondo clean it and use some rust killer on er' :(
 
thanx, i like to do a good job the 1'st time to i don't have to look at it again.:D Yes this is the rig i took boating.:eek: if anyone knows anyone who might need a full or 1/2 frame, i'll build them something that will be better then anything they can get stock,......for a small fee. mabe 1600 for a full and 900 for 1/2. but if i have to drop the s*** off your truck and do your frame as i did my frame i want 900 for the frame 1/2 and $30 per hour. i have a 800 fq foot shop to do it up in. easy to do the wheel wells with no frame there too. dont even neet to pull the motor tranny or t-case, only undo the body mounts and lift the back. sinch if you ask me. also will set anyone up wuth a turbo cheap, takes 2 days. 1 day at my house and 1 at S&J auto for the strait pipe.

good luck, Les
 

Users who are viewing this thread

Back
Top Bottom