- Thread starter
- #221
I think @Ramathorn15 is buried in a residential domicile project, and may emerge soon. He has not stalled out on these, just a very busy fellow!
If he doesn’t show up here in a week, I will do a wellness check on him!
Thanks Tim!
Just so everyone knows. After spending months prototyping, the wife insisted that she get her kitchen reno. It was supposed to be about a month long project, but we've hit some pretty serious hurdles. Like having to rewire the entire house after tearing down some sheetrock and finding extremely dangerous electrical work from before we bought the house. That on top of the world's most uneven concrete.
It's moving much more smoothly now and I'm hoping to be finished with the house around the end of the month (or at least a usable kitchen).
Then I've got to work on the flap group buy. That will hopefully only take a week or two. Then my schedule finally opens up to getting these things going. I'm 100% still planning on getting them rolling, my timeframe is just pushed back a month or two.
For those who like NEC and seeing horribly done work. On top of whats pictured, we also found 10 hidden junction boxes in about 8' of wall. It's a good thing we never tried to hang a picture on those walls!