Well I have just cut down the C off my Dana 60 Long side. and install the C back onto the tube. Im in the pros of welding it soon? How would you go on for it. Preheat, MIG, Let it cool down slow? I was thinking of pre heating it with 2 propane t. and welding it. Just dont know if i should weld it one full pass or spots and and putting the propane on it and let it cool down slow?
Any tips. I have a stick But never really use it. Dont know how strong that welded is !
Any tips. I have a stick But never really use it. Dont know how strong that welded is !