I know we've got several guy's coming from out of town and the times i'm sure will differ when they arrive arrive, in a perfect world i would like to tackle the simple jobs first, such as lockers inop for greensemen, the oil pressure for tristan,grinding and welding for Brock, the diff vent for ocd, as i only have 2 lifts. The master cylinder for ocd can be done in a flat stall, bbq boy's knuckle job will pretty much consume a lift for the day.(BBQ FOR LIFE OR MAYBE JUST A YEAR OR EVEN A DAY) I would like to start Jasons lift installation after we've tackled the other jobs that will require the second lift. I've got another technician coming, that worked for me at the Lexus shop. Whether i can convince him to jump in and help is another story.
I'll jump in and help with the locker diagnosis issue and then probably move on to helping mike with the knuckles and let Dbenke have the rest and then help finish up the remaining after Dbenke has to leave.
I promise guys, i'm not a micromanager, just like to have a plan of action. If anyone (dbenke) has any other ideas Please feel free to interject.