Took about 1-1/2 hours. I had previously prepped by cutting my spacers. I used 5/16 ID steel tubing cut into 1-1/2" lengths, and new bolts, of course. Also, flat washers between the carrier and the new spacers. I raised it a total of 1-5/8" inch (1-1/2" spacer and about an 1/8" for the flat washer). I had to drop the winch 3/4" in order to get the handle thru the cutout in the valence. I made no mods to the carbody at all. I used a 3/4" oak block to space the winch down. Looks better, although not as good as no tire at all back under there. All in all a
job. Air tools help.....
Next mod is to relocate the trailer plug and wiring, to clean up the departure angle a bit....


Next mod is to relocate the trailer plug and wiring, to clean up the departure angle a bit....