woooody ROTW

This site may earn a commission from merchant affiliate
links, including eBay, Amazon, Skimlinks, and others.

cool rig gives me a few ideas...
 
You got envy city goin over here :D


Really great rig. Like the bumpers a lot.


How long do you suppose you've got into waiting on work being done and
the amount of time you put in yourself?

Thanks

It was down for about 6 months when the power steering/SM 420 were installed.

It was down for another 6 months during the frame repair/SOA was done.

It was done for 6 months while I messed around trying to fix the engine. Then 1 long day at Mudraks when I installed the 2F.

The cage was a one day install at Deckers.

The fenders were a one dayer.

So, maybe 13 or 14 months in the shops over the last nine years? and at least 8 or 10 months of downtime when I did my things on it. 2 years total?

But it also seems like there is always a month of downtime before the summer.
 
Was the dashbox done by Mark Vickers?
 
Hey Dave

I think that was his name, but it was so long ago, I couldn't swear to it.
 
So, maybe 13 or 14 months in the shops over the last nine years? and at least 8 or 10 months of downtime when I did my things on it. 2 years total?

But it also seems like there is always a month of downtime before the summer.

Sounds about like the average I suppose.


and isn't that true about the month before summer.


Thanx
:beer:
 
Just came across your post. Nice rig. Real practial for use. I have a fairly stock 72 which can use all kinds of mods. Maybe someday when my cruiser grows up it can be like yours. I am in Napa, would l more than likely meet one day.

george
 

Users who are viewing this thread

Back
Top Bottom