Just got my Goose Gear drawer system installed. I am still waiting on the carpet to come so I can install the top. Brian at Goose Gear did a wonderful job. His attention to detail and communication with me was outstanding.. I moved my 110v outlet to the front panel because when the top is installed it would have covered up the 110v factory location. Let me know anyone has any questions.