Hi guys,
Am house hunting and found a place I like. Unfortunately it has PolyB pipe with copper fittings, but has a basement with a drop ceiling to get at it.
I have been researching, watching youtube and want to go with PEX, Viega system, not cheap, but....
My key question, is how to run the pipe up to the second floor with minimal drywall tearout?
Are there any tricks, etc?
Am house hunting and found a place I like. Unfortunately it has PolyB pipe with copper fittings, but has a basement with a drop ceiling to get at it.
I have been researching, watching youtube and want to go with PEX, Viega system, not cheap, but....
My key question, is how to run the pipe up to the second floor with minimal drywall tearout?
Are there any tricks, etc?