long day.
installed a bumper then we headed out for photos.
had great local customer support and dirty toad and his family drove 1.5 hours to make the run. (thanks gunner, sorry you couldn't make the photos)
8+ rigs total at the start.
thanks all for helping me out and post up any photos you want guys.
this is one that the lens didn't open up all the way
(moab sand)
jim
installed a bumper then we headed out for photos.
had great local customer support and dirty toad and his family drove 1.5 hours to make the run. (thanks gunner, sorry you couldn't make the photos)

8+ rigs total at the start.
thanks all for helping me out and post up any photos you want guys.
this is one that the lens didn't open up all the way

jim