Hey guys--
*Finally* found time this weekend to pull the 2F out of my 87 FJ60. I grabbed a 2 Ton engine stand off CL for $20, and am borrowing a hoist from a friend (thanks to those who convinced me not to kludge these together).
Anyway, my question is this: After some searching, I've determined that at least for the F engine 10mm bolts are required to connect the block to the stand. Is this the case for the 2F as well? And if so, anyone know the exact thread pitch I need?
Also, any other tips for this project would be greatly appreciated...all my projects on other cars have involved everything but the engine, so I'm a first timer doing this.
Thanks in advance,
JD
*Finally* found time this weekend to pull the 2F out of my 87 FJ60. I grabbed a 2 Ton engine stand off CL for $20, and am borrowing a hoist from a friend (thanks to those who convinced me not to kludge these together).
Anyway, my question is this: After some searching, I've determined that at least for the F engine 10mm bolts are required to connect the block to the stand. Is this the case for the 2F as well? And if so, anyone know the exact thread pitch I need?
Also, any other tips for this project would be greatly appreciated...all my projects on other cars have involved everything but the engine, so I'm a first timer doing this.
Thanks in advance,
JD