Limited problems have appeared that I have had to address.
1) The POR'd stuff is holding up great (a lot of stuff was blasted, etched and painted, then sat for months before getting put on). I think POR is all in the prep.
2) The engine rear main seal is leaking again, and I have not...
Polak, thanks. And yes, it was aggressive. I am glad a had the frame and worked it the year before, instead of having to take the truck apart and then do the frame.
gb
....The hazard of shooting your girlfriend a note with a link to the thread, and her accessing your account and posting ;-)
Yes Crushers...a lot of work...and I really did not do much mechanical. That is a testimoney to the 3B drivetrain...
BJ70_Guy, that was the Boy Scout run...right...
You know Beanz...I am pretty sure it was 2001 (the first year I attended). We ran into snow on the way back from Elephant Hill, missed the TLCA pot luck. We attended in 2002 as well...
gb
Tub painted and ready, firewall back on the frame (I decided it was easier on the knees and back to put the harness back in while I could stand in front of the dash), and finally the tub and firewall ready for the application of the Silkaflex, and bolting together.
Another 40 series renovation-Aqualu Tub Install
Seems there always in interest in seeing someone's project, so even though this one is a few years old, and I have time to post, perhaps some of you might find this interesting, or helpful. This was my first time EVER doing anything like this...