- Joined
- Feb 10, 2002
- Threads
- 550
- Messages
- 44,786
- Location
- Canton, Mississippi
- Website
- www.seeandeatms.com
- Thread starter
- #641
I started this process on August 22nd. Trying to get a head start on the shackles and the overall cleaning and prep for the lift.
Meanwhile Ups loses my parts so I’m the mean time I have
1) painted the truck with Rustoleum mostly one color
2) sold my roof rack, bought load bars
3) cleaned up engine bay with new washer bottle, overflow, paint, etc
4) installed stereo
5) added Noico in all the side panels.
I guess it was a good thing I was down and waiting for parts after-all......
Meanwhile Ups loses my parts so I’m the mean time I have
1) painted the truck with Rustoleum mostly one color
2) sold my roof rack, bought load bars
3) cleaned up engine bay with new washer bottle, overflow, paint, etc
4) installed stereo
5) added Noico in all the side panels.
I guess it was a good thing I was down and waiting for parts after-all......