I am finishing up my Mechanical engineering degree at UAH and because of that I had the opportunity to work a paid internship with these guys this summer. The show, while being filmed, seemed to be on the cheesy side in some respects, but the math worked out and a lot of engineering actually went into the show. Here is a link to one of the shows trailers that I helped out A LOT on. This was one of the weekends we worked from 7:30am-3am then started again the next morning at 7:30. These guys actually all have real jobs so all the shows were done on the weekend and work out to be approximately 1 show = 1 weekend. Check em out on Wed the 28th if you get a chance.