kiwidog
Kiwidog
Here's my Christmas break project.
Hub nut socket with 54 mm later and 50 mm early in one tool.
Started with 2 1/4 od exhaust tube.
The 50mm nut is OK for the inside diameter of the tube so I just heated and forged till it fit.
The 54mm end with made out of 3/4 x 1/8 flat and cut and welded to form the hex. I used piece of plywood cut to a 54mm hex to hold the pieces while I tacked them together, use gas torch to weld the six seams and filed them to fit.
Them gas welded it to the other end of the tube.
Drilled a couple of holes to use a bar for leverage and then it was done.
Another SST for the box
Thanks jbhttp://images.ih8mud.com/images/smilies/beer.gif
Hub nut socket with 54 mm later and 50 mm early in one tool.
Started with 2 1/4 od exhaust tube.
The 50mm nut is OK for the inside diameter of the tube so I just heated and forged till it fit.
The 54mm end with made out of 3/4 x 1/8 flat and cut and welded to form the hex. I used piece of plywood cut to a 54mm hex to hold the pieces while I tacked them together, use gas torch to weld the six seams and filed them to fit.
Them gas welded it to the other end of the tube.
Drilled a couple of holes to use a bar for leverage and then it was done.
Another SST for the box
Thanks jbhttp://images.ih8mud.com/images/smilies/beer.gif