J Joshyota 10 Year Joined Jul 20, 2014 Threads 1 Messages 14 Jul 25, 2014 Thread starter #21 All welded up and on just waiting on my 2inch pipe to finish it then need to run longer wires to install solenoid inside the glove box
All welded up and on just waiting on my 2inch pipe to finish it then need to run longer wires to install solenoid inside the glove box
J Joshyota 10 Year Joined Jul 20, 2014 Threads 1 Messages 14 Jul 25, 2014 Thread starter #22 Pretty happy considering I'm not a boiler maker haha