Fordyce Work day (1 Viewer)

This site may earn a commission from merchant affiliate
links, including eBay, Amazon, Skimlinks, and others.

rusty_tlc

Dain Bramaged Member
Joined
Jun 23, 2005
Threads
494
Messages
13,848
Location
Reno, NV
Website
forum.ih8mud.com
I don't know if anybody else get the FOTF letters.
COMMITTEE TRAIL RE-ROUTE WRAP UP WORK DAY


When: October 25, 2008 9am.

Where: Meet at Fordyce Lake.

What: Transport rock from a local source less than 100 yards away and deposit in an area of seasonal water flow.

Why: To harden the area so erosion is controlled.

Duration: Estimating approximately 3 hrs.

Resources needed:

10 to 15 volunteers with gloves and strong backs. No trail exists to access the rock so we will just carry them from their present location to the new section of trail.

Additional information:

Water, sodas and snacks will be provided.

An informal trail run to Meadow Lake will follow for any interested people, water flow permitting.

If the water release is too high for the safe passage of the majority of rigs an alternate run to Signal Peak will be considered.

Closing and renovation of the existing section of Committee trail to be replaced will be scheduled for next spring.


Please respond to bpreble@icominc.com if you plan to attend this work day.

Thanks,

Bret Preble
President
Friends of Fordyce
 
I can't commit yet, but if anyone is going I might be able to ride along that day and move some rocks.

I've never seen fordyce, and it'll give me a good reason to buy some steel toes.
 
If its a weekend, Ill do it!
Id love to have an opportunity to help a little, and check it out.

Im sending an e mail.

K
 

Users who are viewing this thread

Back
Top Bottom