Any of you guys know about how much it'd cost me to get a building permit from the city (Spokane Valley)? Vera won't bring power to my shop (installing a meter for 200A service) without a permit.
I still have to install a weatherhead, meter base and 2" (according to the tech from Vera) conduit to run the leads into my shop too. Anyone got experience doing that on a pole barn type shop?