after careful consideration, and numerous phone calls. I have ordered a 1/2 tub from ipor, and rocker panels, to get my project RE STARTED!
I should have them in about 3 weeks. Then I will begin to re assemble in earnest....
I should have them in about 3 weeks. Then I will begin to re assemble in earnest....
